Friday, September 29, 2006
GLASS BRIDGE
GLASS BRIDGE
The Glass Bridge Construction of the Skywalk began March of 2004 and is estimated to be completed by 4th quarter of 2006.
Glass Bridge will be suspended 4,000 feet above the Colorado River on the very edge of the Grand Canyon. On May 2005, the final test was conducted and the stucture passed engineering requirements by 400 percent, enabling it to withstand the weight of 71 fully loaded Boeing 747 airplanes (more that 71 million pounds).
The bridge will be able to sustain winds in excess of 100 miles per hour from 8 different directions, as well as an 8.0 magnitude earthquake within 50 miles. More than one million pounds of steel will go into the construction of the Grand Canyon sky walk..................
GREAT THINGS ARE DONE WHEN MEN AND MOUNTAINS MEET,
THIS IS NOT ACHEIVED BY JOSTLING IN THE STREET................
Monday, September 25, 2006
Saturday, September 23, 2006
Friday, September 22, 2006
Thursday, September 21, 2006
Tuesday, September 19, 2006
Husbands are really innocent!!!
Monday, September 18, 2006
Sunday, September 17, 2006
Saturday, September 16, 2006
Subscribe to:
Posts (Atom)